It’s last call for Centre Wellington residents as part of the water meter installation program.
The project is set to wrap up on May 16th with most homes in the township having made the switch but there still is time for those to get their replacement done.
Those who have received a letter from the township that your home requires a replacement can book your installation before you notice a cost jump on your bill.
After the May 16th deadline, there will be a $94.60 charge added to their monthly water and wastewater bill until the meter replacement is completed.








