Chip & Seal operations are planned to start Thursday on Line 89 from Road 165 to Road 178.
For the time being drivers are asked to proceed with caution after the chip has been placed and keep a watch for any loose stone signs which will be posted in repair areas.
Caution Loose Stone signs will be posted as the conditions will be similar to that of loose gravel in the first weeks of placement.