They expect there to be 17 chargers in operation by next summer through the Ivy Charging Network which is a joint venture between Hydro One and Ontario Power Generation.
Another 3 sites will be added before the end of next year to bring the total to 20.
The move will be charging capabilities adding along Highway 401 and 400 with at least 2 at each site.