Ryan Steckley from CIMA+ presented the report that in addition to the immediate concerns also outlined work needed in the next 5 and 10 years of operations. Those amounts came back at $1 and $1.2 million dollars respectively.
The town also heard that once the Water Tower planned for Drayton is constructed, there would be less reliance on the existing pumping station in Drayton.
A link to the full report is below.